Compliance readiness

An environmental inspection can ask you for up to 50 documents, permits and tests. We prepare them for you.

The requirement checklists the authorities use in environmental inspections cover everything from the articles of incorporation to effluent, noise and emissions testing. We advise you so your company meets every point, we file whatever is missing and we support you during the inspection.

Why now

The 2026 framework made environmental liabilities an operator obligation, and the oil reactivation multiplied the work in the field.

We know those rules and design our services to comply with them.

Regulatory changes, what they mean and how we help
What changedWhat it means for youHow we help
Amendment to the Organic Hydrocarbons Law (G.O. —Official Gazette— 6,978, January 2026) and its Regulations (Decree 5,381, G.O. 7,052, July 2026)The operator must restore affected areas and remediate accumulated environmental damage (art. 9)Liability assessment, hydrocarbon recovery and remediation
Serious environmental damage is a very serious offenseFines, revocation of the authorization, termination of the contract and up to 15 years barred from government contractsPreventive compliance and an up-to-date file
Dismantling is the operator’s responsibility (art. 26) and decommissioning must be notified for authorization (art. 66)Closing facilities requires a plan, permits and a documented close-outIndustrial decommissioning with a complete file
Recoverable hydrocarbon waste can be industrialized (art. 60)Crude in sludge is a resource, not just wasteHydrocarbon recovery plants
Mandatory local content (art. 6)Projects must incorporate Venezuelan goods, services and talentVenezuelan group companies with international technology
Environmental Criminal Law: client and contractor are jointly liable (art. 16)A bad environmental vendor is a legal risk for youExecution by licensed companies and traceability by batch
Recyclable metal is a strategic material (Decree 4,445) and public entities need SUDEBIP (Superintendency of Public Assets) authorization to decommission itIts sale and export are regulatedGroup companies with export authorization, verified origin and decommissioning files
The Stockholm Convention sets 2028 as the deadline to safely dispose of equipment containing PCBs (polychlorinated biphenyls)Old transformers are a liability with a deadlineInventory, sampling and management with an authorized destination
New operators are reactivating hundreds of wells in mature fieldsMore locations to remediate, more equipment replaced and more purchasing in the fieldSupply, location remediation and the From Liabilities to Assets program
What the authorities may ask for

Six categories. We take care of the whole list.

Company and premises
  • Articles of incorporation and amendments
  • RIF (Tax Information Registry) of the company and its partners
  • Property ownership or lease documents
  • Legal origin of raw materials, machinery and equipment
  • Municipal land-use approval
  • Building permit and zoning variables
  • RUPDAE (Single Registry of Persons Engaged in Economic Activities)
Environmental registrations and permits
  • RACDA (Registry of Activities Capable of Degrading the Environment) as generator or handler
  • Technical accreditation from MINEC (Ministry of People’s Power for Ecosocialism) with an environmental impact study
  • Environmental performance certificate
  • Registration as a material recovery company
  • Description of the production process
  • Environmental remediation plan
  • Earthmoving and soil impact permits
  • Occupation of ABRAE (Areas Under a Special Management Regime)
  • Tree pruning or felling permit
  • Water source user registration
Waste and substances
  • Hazardous waste tracking sheet (Decree 2,635)
  • Certificate for handling hazardous substances, materials and waste
  • Transport permit for recoverable materials
  • List and data sheets of chemical products
  • RESQUIMC (National Single Registry of Controlled Chemical Substance Operators)
Testing and monitoring
  • Liquid effluents (Decree 883)
  • Noise (Decree 2,217)
  • Air emissions (Decree 638)
  • Laboratory tests for metals and bacteria
  • Testing of finished products
Safety and risks
  • Fire Department permit
  • Emergency plan
  • Environmental damage insurance policy
  • Registration with INPSASEL (National Institute for Occupational Prevention, Health and Safety)
  • Power generator installation permit
Depending on the activity
  • Forestry: REGIFOR (National Registry of Forest Industries), forest product logs and permits
  • Hydrocarbons: registration with the Ministry of Hydrocarbons
  • Food and health: health permit, health certificates, fumigation plan, product health registration, agri-food registration with SUNAGRO (National Superintendency of Agri-Food Management) and RUNSAI (National Single Registry of Integrated Agricultural Health)
  • Fishing: INSOPESCA (Socialist Institute of Fisheries and Aquaculture) permit
How we get you compliant

Five steps, from assessment to keeping it current.

  1. Assessment against the inspection checklist

    we review what your company has and what it lacks, requirement by requirement.

  2. Complete file

    we organize your documents and prepare the missing ones.

  3. Filings and testing

    we handle registrations and permits and coordinate testing with registered laboratories.

  4. Support during the inspection

    we assist you during the visit and in responding to any notice.

  5. Keeping it current

    we keep the renewal calendar so nothing expires.

Reference legal framework

The regulations we apply in every service.

Would your company pass an inspection today?

In a first visit we identify your liabilities, your recoverable value and your outstanding obligations.

WhatsApp